Wednesday, April 30, 2008

Task 5.

H. TROON

More images of bondek and the pillars that are spaced to support the above flooring.
This building is going to be a 5 star rating buliding so they have installed a tank which will then supply the bulding with their own water.
This is the undercover parking, here is the 'bondeck' type material that supports the flooring above. A concrete pillar supporting the florring above as well.
A box gutter, drainage system, which is supported by a steel connection which is bolted into the pre-cast concrete panels


Close up of the connection of the pre-cast concrete panels, they are bolted together and then a mastic type material also is in place to allow some movement.
This picture shows the services, eg air conditioning, electrical in the roof and after all these services have been installed plasterboard will cover the ceiling and the services
Here is a pipe that is being held up by a type of string to the 'C' purlins in the roof. Also a beam with bracing coming off it.

This is a close up of the connection between the pre-cast concrete panels, this is a mastic type material that alllows some movement.
A close up of the connection of steel to the concrete, this is supporting the 'C' purlins in the roof.
Here you can see the beam cast into the pre-cast wall with the addition of a bolted connection. There is also secondary beams spanning from the primary beam. There is also very heavy bracing to support the primary beam. Also visible is the services.
Here is a pre-cast concrete wall, with steel bolted and welded connection, there is also a beam bolter in to the wall. This wasll is load bearing, which is giving support for the roofing and the long spanning of the roof with the beams.
Tilt your head to the LEFT this is pre-cast concrete, the supporting beams have been taken out and you can see that it has been patched up. There is no structual load on these walls, they are their for asthetics only.
H. TROON is the construction company that have been contracted to build this office block for the Department of Health in Ballarat, Armstrong St North.
Here are the lovely subcontractors just finishing rendering the supporting posts for the enterance of the building. The concrete that you can see is all prefacbricated and brought to site.
Another enterance to the buliding, their are two office spaces on for the department of health and the other will be put up for lease. The concrete doesnt take the load it is just their for asthetics.
Below is a conection between two steel beams, stiffing and a column to support, along woth bracing. Bolted connection between all the steel components

Thursday, April 24, 2008

Task 4.

Task 3.

Palmer Brothers Eng. Details

This detail show the site plan; where the portal frame construction is situated on the site.
This is the roofing detail. Bracing, 'C' purlins, beams.
This the the floor plan, you can see the columns and their spacing, to give the open span. Also the entrances and exits are visible.
This is just the site elevations of the portal frame construction of Palmer Brothers. This is a detail of the elevations from the front entrance an the rear.
This is a detail drawing of a portal frame construction. What you can see is the column and beam connection, footing details, the wall and roofing materials used.

Tuesday, April 22, 2008

Article 2.

Construction 'to reach $82b in 2008-09'


November 22, 2007 - 10:49AM

Engineering and commercial construction activity by the private sector is expected to reach a record high of $82 billion in 2008-09, a new report shows.

But many of the country's leading construction companies say they are experiencing continued pressure from scarce resources and tight profit margins.

Construction companies are forecasting a 7.4 per cent increase in the total value of construction work which would build on a hefty 10.8 per cent increase expected for 2007-08 and 12.1 per cent growth in 2006-07, the Australian Industry Group (Ai Group)-Australian Constructors Association (ACA) construction outlook says.

"The survey confirms that engineering and commercial construction remains strong," ACA president Wal King said.

"It is also clear, however, that supply constraints and rises in construction costs pose a risk to growth prospects, with many firms continuing to face intense pressure from both scarce resources and tight profit margins."

Reflecting a sizeable backlog of work and further infrastructure investment plans, the report says engineering construction is forecast to be the major driver of growth, with total turnover predicted to rise by 14.2 per cent in 2007-08 and 9.7 per cent in 2008-09.

Non-residential building, or commercial construction, is forecast to expand further to generate $30 billion of work in 2008-09, although the pace of growth is expected to moderate to 7.1 per cent in 2007-08 and 3.5 per cent in 2008-09.

Apartment building sector work is expected to decline by 12.8 per cent in 2007-08, before regaining some ground in 2008-09 with a rise of 2.1 per cent.

Ai Group chief executive Heather Ridout says the continued growth of the engineering construction industry is positive news with the sector making a great contribution to the national economy.

"The construction industry continues to demonstrate its capacity to respond to the demands of the market but it will take much greater collaboration between clients and contractors if we are to maximise the benefits of the current surge in activity.

"We can no longer burden industry with the costs of tendering that are diverting valuable industry resources.

"We need new, collaborative procurement models that improve coordination between public sector agencies, both state and federal.

"Ideally, the industry needs three- to five-year visible project horizons to allow resource planning and better coordination."

Growth in engineering construction is expected to be broadly based, although key contributors to the strong two-year outlook include transport infrastructure, mining construction and heavy industry.

Solid rises are also expected in telecommunications infrastructure, water supply projects, power generation, and other civil projects such as the construction and upgrading of freight and port facilities to ease export bottlenecks.

This story was found at: http://www.theage.com.au/articles/2007/11/22/1195321911968.html